It's been a productive week on site! The tarmac has now been laid, providing a dedicated area for parking.

The team has been focused on ensuring the gas membranes are correctly fitted and secured throughout the building.

Up on the roof, work continues with excellent views of the changing skyline. Back on the ground floor, all steel fixings have been thoroughly checked and secured according to specifications.

Finally, insulation installation is progressing well, which will ensure the building maintains optimal temperature control once completed.